Pructon was engaged to conduct a major maintenance shutdown of the Dragline 2 at Rolleston Mine. This comprehensive project involved a range of critical repairs and upgrades, including undercarriage work, boom lowering, boom upgrades, propel replacement, synch motor replacement, mast foot pin upgrades, roller path upgrades, and fairlead sheave replacement. The project also included the removal and repair of the hoist drum, ensuring optimal performance and safety.