Client
Rio Tinto
Location
Gladstone, QLD
Completion Date
2023
Project Type
SMP Construction, Industrial Blasting and Painting, Shutdown Maintenance
Located 10 km north-west of Gladstone, the Yarwun Alumina Refinery produces nearly 3 million tonnes of alumina annually. To enhance the structural integrity of the tank structures, Pructon was engaged to replace supporting members that provide foundational support to the centre tank top, which is also supported by the walkway bridge above. This installation has significantly increased the safety and longevity of the tank, which is crucial for holding the bauxite sludge in the aluminium extraction process. A shutdown period was necessary, with 24-hour shifts implemented to ensure rapid resumption of operations.